Featured image this week is module #105 which was actually the first module. If you look at week ~ 9 you can see it before it was moved and before it was flipped upside down to its natural position. This image is where it will actually be in this general location. The rest of the ship will be constructed around it for approximately 30 months. Below images are of Module #104 and sides of hull for it. Other ship components in fab shop are in various stages of construction. Skilled workers are hard at it, as always. Great dedicated men and women who are committed to quality craftsmanship, no exaggeration!#5 10.3.15 copy #4 10.3.15 copy#3 10.3.15 copy