View of the first bulkhead installed, secured and attached to the module that was installed in the 25th post. Below is the view from the opposite side of the bulkhead from the south (stern).

#2 1.8.16 copy

And back in the big house, work on the pilot house is in full swing. You can see how rapid the progress is going…

#1 1.8.16 copy

 

#4 1.8.16 copy