Floating Steel

Follow the construction of a Bering Sea Fishing Trawler from start to finsh

Month

May 2016

Week ~ 46 (Click on post image to view more images)

She’s looking like a floating castle…     The paint crew is amazing…as soon as an interior section has the basics constructed the paint crew is right behind with a coat of primer! This last image is the rudder under… Continue Reading →

Week ~ 45 (Click on post image to view more images)

A view from the top…all aluminum roof of the control room (pilot house).     The next two images are of the bow thruster assembly being made in the Big House (fab shop). Of course construction is upside down for… Continue Reading →

Week ~ 44 (Click on post image to view more images)

Alls quiet…three day weekend at Dakota Creek…check it out .

Week ~ 43 (Click on post image to view more images)

On-going construction of engine room in stern (rear). Stern south side facing north…the beat goes on. West side, entire view from stern to bow. In the Big House (fab shop) skirt being installed on control room (bridge) roof. Viewing bow thruster assembly unit (upside… Continue Reading →

Week ~ 42 (Click on post image to view more images)

WHAT the….!!   Angles, and lines, oh my… The growing up of Americas Finest…

© 2017 Floating Steel — Powered by WordPress

Theme by Anders NorenUp ↑