A view from the top…all aluminum roof of the control room (pilot house).

 

 

The next two images are of the bow thruster assembly being made in the Big House (fab shop). Of course construction is upside down for obvious reasons. This unit will be located just aft (rear) of the bow section.

#1 5.18.16 copy

#2 5.18.16 copy

 

The first image is the port side of Americas Finest where the cargo door for the elevator is being installed. The next two images show the top and the bottom inside of the cargo elevator.

5.13.16 copy

#3 5.13.16 copy

#4 5.13.16 copy