An inside cut view…next view of work farther into her belly. This 50th week has been a busy week for, “Americas Finest”. A fish processor was installed, windows were cut into the pilothouse. And work continues on the bow and bulbous nose that attaches to it.#6 6.24.16 copy

 

watch a fish processor installed…#1 6.21.16 copy

#2 6.21.16 copy

#3 6.21.16 copy

#4 6.21.16 copy

#5 6.21.16 copy

 

Views from outside and inside of pilotHouse as windows are being installed inside the Big House (fab shop).

#4 6.24.16 copy

#1 6.24.16 copy

 

Next image is the bow being constructed…

#5 6.24.16 copy

And last work continues on the bulbous nose back in the Big House.

#3 6.24.16 copy