Yes, its a net bin one of three to be built for Americas Finest. The pilothouse, all aluminum is shown in the background with her windows installed covered in black.

 

#6 7.22.16 folder 103 copyTop side of pilothouse almost finished with all aluminum interior and exterior. Entire unit will be painted soon, stay tuned.

 

#1 7.22.16 folder 103 copy

This weeks hull shot, impressive as always.

#2 7.22.16 folder 103 copy

Looking up towards the the top decks from main deck facing North bow side.

 

Next two images are of the bow (always built upside down) with bow thruster and thruster housing unit being constructed.

#3 7.22.16 folder 103 copy

#7 7.22.16 folder 103 copy